Region: Chongqing Progress: Engineering Design and Construction Period: 2011-2017 Major equipment: firefighting facilities, cranes, excavators, fans, speed-up devices, generators, control devices, adjustment systems, and support towers.
Project Description:
The project is located in Chayuan New District, Nan'an District, Chongqing City. The project plans to use approximately 189.15 mu of land, covers an area of ​​approximately 126,160 square meters, and has a planned total construction area of ​​approximately 2,19,911 square meters with 1,200 social beds. The phased construction of the project is expected to be completed and put into use within six years. The total investment of the project is 1.208 billion yuan.
Construction Unit: The Second Affiliated Hospital of Chongqing Medical University Postal address: 76 Linjiang Road, Yuzhong District, Chongqing Postcode: 400010
Contact person: Zhang Kai, Yin Shuya Telephone Fax
Design Unit: China Building Southwest Design and Research Institute - Chongqing Branch Postal address: 12th Floor, Tongju Prospect, Jiangbei District, Chongqing Zip Code: 400020
Contact: Chen Xi Construction Engineer Telephone Fax
Design Unit: China Building Southwest Design and Research Institute - Chongqing Branch Postal address: 12th Floor, Tongju Prospect, Jiangbei District, Chongqing Zip Code: 400020
Contact: Zhang Bin Electrical Engineer Telephone Fax
Concrete Vibrator,Battery Vibrator Motor,Concrete Vibrators,Eccentric Vibrator Motor
NINGBO MAX MACHINERY CO.,LTD , https://www.max-machinery.com