How to distinguish the difference between Dongfeng 145 and 153

Many sprinkler users do not know the difference between Dongfeng 145 sprinkler and Dongfeng 153 sprinkler when choosing a sprinkler. In fact, it is difficult to distinguish between 145 and 153 from the appearance, but starting from the details, you can easily judge.

Hubei Chengli sprinkler manufacturers teach you the easiest way to identify 145, 153 car chassis. Below, we will explain to you: How to distinguish the Dongfeng 145, 153 car chassis, to see what is the difference between them?


First from the appearance:
Different tire specifications: Dongfeng 145 is equipped with Aeolus 9.00 nylon tires, while Dongfeng 153 is equipped with Aeolus 10.00 nylon tires;
The number of tire bolts is different: there are 8 conventional Dongfeng 145 front-screw screws and 10 front-screw Dongfeng 153 screws;
Different wheelbases: Dongfeng 145 uses a wheelbase of 3950mm and Dongfeng 153 uses a wheelbase of 4500mm.
Different thickness and length of leaf spring: Dongfeng 145 leaf spring adopts national standard 8/11+8 slice type, each slice thickness is 16mm, Dongfeng 153 leaf spring adopts national standard 8/11+8 slice type, each slice thickness is 20mm, Dongfeng 153 series Dongfeng 145 series leaf spring is 156mm longer;
The front axle and the rear axle are different: Dongfeng 145 is a 5-ton platform truck with Dana's 3.6-ton I-shaped front axle and 9-ton deceleration rear axle. Dongfeng 153 bridge is an 8-ton platform truck with Dana 5 Tonnage I-shaped front axle, 10 ton deceleration rear drive axle.
The material and shape of the air intake cap are different: the upper part of the Dongfeng 145 air filter device is a round iron cap, while the upper part of the Dongfeng 153 air filter is a plastic square cap;


The difference in performance:
Engine horsepower is different: Dongfeng 145 and 153 chassis can choose Cummins and Yuchai engines, but the conventional Dongfeng 145 sprinkler power is generally 140 horsepower to 170 horsepower, and Dongfeng 153 water truck power is generally 180 horsepower to 190 horsepower.

The two models look the same. In fact, the 145 model has a smaller tonnage. At the time of purchase, it should be cheaper. The 153 model should have a larger tonnage and be more expensive at the time of purchase.

Forged Metal Core

We can manufacture a wide variety of metal cores for rubber track,and metal cores are essential spare parts in rubber track production.Now our metal core have been sold to many countries such as Thailand,Japan,USA and have been warmly welcomed by them,below is our products information:

1,Main Material: carbons steel 45# and alloy steel 40Cr or some other materials which customer requested.

2,Heat Treatment:HRC42-46 or some other hardness which customer requested.

3,Surface treatment:Shot Blasting.

4,Producttion Equipment:300Ton,400Ton,630Ton,1000Ton,1600Ton,2500Ton Press.

5,Product Weight:0.1kg-20kg

6,Models: From LG100*72 to LG 800*150



FAQ:

1. Are you a genuine manufacturer?Yes, all products showed in our website are produced in our ISO9001:2015 certified factory; We are also a company registered by China Customs with the right to export and import.

2. I want to keep our design in confidence; can we sign NDA?Sure, to protect customers' profit is our obligatory responsibility, signed NDA would be valid to both of us..

3. What should I offer to get your quotation?Please offer us your detailed information for the product, such as drawings with 2D/3D by software Pro/E, Auto CAD, SolidWorks, UG etc; as well as materials, surface treatment, quantity, package. Any special requirements should be highlighted especially for tolerance.

4.How long does it take to receive samples?
20 working days,the lead time is the general production period and does not include the transportation time.
we can supply free samples with less quantity,but customers need to pay shipping cost.

5.How long is the manufacturing lead time?
Mass Production:30-45 working days after sample approval by yours.The lead time is the general production period without the transportation time.
We could make some special production arrangement effectively if customer has urgent need.

6.How long does it take to ship goods from China by sea?
It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container within 6 to 7 weeks.It takes about 2 weeks to east coast and 3 weeks to west coast US ports.All sea goods are shipped from Ningbo Port.

7.How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.

8.What are the payment terms?
Payment terms are negotiable and will improve for long term customers.During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.Production orders can be negotiable.We prefer 30% deposit and the balance by T/T before sails.But sometimes T/T15 days after sails would also acceptable.

9.New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept.To ensure the developing schedule---Design mould, fixture and gauge and making them in our factory---mould.fixture and gauge making---producing samples---approved from customer-purchasing material-forging-heat treatment-shot blasting-machining-Inspection-package---delievry


10.Which countries do you export to?
Now mainly export to U.S.A, Germany, France, Italy, UK, Brazil, Swedish, Japan, Korea, Middle east of Asia, Thailand and so on.

11.Can we visit the factory to conduct an audit?
Yes, you are welcome to visit our factory.

12.How to handle the complains?
--If happen any complaints after delivery,please just show us photos and detail compliants points, we will check with the production department and QC department Immediately and give you best solving solution which agreed by both of us,moreover we will bear all the cost (including shipping cost).

Forged Metal Core,Forging Iron Core,Forged Excavator Parts,Metal Core Of Rubber Track

Wenzhou Lianggong Forging Co.,Ltd. , https://www.lianggongforging.com